学位论文—-长兴岛临港工业区煤炭码头2号泊位工程设计生.doc


文档分类:办公文档 | 页数:约112页 举报非法文档有奖
1/112
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/112
文档列表 文档介绍
长兴岛临港工业区煤炭码头 2 号泊位工程设计 The changxing island lingang industrial zone of coal terminal berths of engineering designStructure type 摘要长兴岛临港工业区位于辽东半岛西侧中部,渤海东岸,总面积 502 平方公里,由长兴岛、西中岛、凤鸣岛、交流岛、骆驼岛五个岛屿组成,其中长兴岛本岛面积 平方公里,是中国第五大岛,长江以北第一大岛。围绕辽宁省战略布局,大连长兴岛临港工业区发展思路和目标是:按照“超常规、快速度、高质量”的总体要求,充分利用区位和临港优势,承接国际国内特别是东北产业升级转移,重点发展船舶制造、石油化工、装备制造、高新技术、现代服务和港口物流产业,建成东北重要临港产业集聚区、大连东北亚国际航运中心重要组合港、大连拉近和辐射东北腹地的重要节点城市。到2020 年,地区国民生产总值达到 1300 亿元,地方财政一般预算收入 120 亿元, 港口吞吐量 1 亿吨,累计实际使用外资 300 亿美元,内资 3000 亿元人民币,成为全省改革创新先行区、对外开放先导区、临港工业集聚区、生态建设示范区、和谐宜居新城区,常住人口达到 100 万人。关键词: 战略布局; 基础设施建设; 港口建设; 资源整合 ABSTRACT The changxing island lingang industrial zone is located in the middle of the west side of the liaodong peninsula, the bohai sea on the east, with a total area of502 square kilometers, consists of changxing island, west island, fengming, communication, and camels island of five islands, changxing island of the island covers an area square kilometers, is the fifth largest island in China, the largest island in north of the Yangtze river Around the strategic layout of liaoning province, dalian changxing island lingang industrial area development ideas and goals is: according to the "extraordinary, quick speed, high quality" the general requirements, make full use of the location and the advantage of bordering on the harbor, to undertake domestic and international, especially the northeast industrial upgrading, the development of shipbuilding, petrochemical industry, equipment manufacturing, high-tech, modern services and port logistics industry, built the northeast important lingang industrial concentration area, important ZuGeGang dalian northeast Asia international shipping center, dalian closer and radiation northeast hinterland important node of city. By 2020, the regional GDP reached 130 billion yuan, the local finance general budget revenue was 12 billion yuan, the port throughput of100 million tons, the total actual use of foreign capital of$30 billion, domestic capital is300 b

学位论文—-长兴岛临港工业区煤炭码头2号泊位工程设计生 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数112
  • 收藏数0 收藏
  • 顶次数0
  • 上传人Alphago
  • 文件大小3.91 MB
  • 时间2017-03-27