摘要此次毕业设计, 设计的是东立一号楼施工图纸,建筑面积为 ㎡,底层建筑面积 ㎡,建筑层数:地上七层。层高:一层商服层高 m 二层商服层高 m住宅 3—7层层高 m总建筑高度 m。施工组织设计的内容包括编制依据、工程概况、施工部署、施工进度计划、施工准备与资源配置计划、主要施工方案、进度管理计划、质量管理计划、安全管计划、季节性施工、施工现场平面布置图等。本次使用工期定额是全国统一建筑安装工程工期定额( 2000 )。关键词:施工组织组织管理质量保证施工方案 Abstract his graduation design isa design of Dongli building construction drawings, construction area of square meters, the building area of square meters, building floors: seven floors on the ground. Storey: a business suit, storey , two storey business clothes, storey house, 3- 7, high , high building height . The anization design content including the basis for preparing projectprofiles construction deployment, construction schedule, construction preparation and planning, resource allocation scheme, main construction schedule management plan, quality management plan, safety management plan, seasonal construction, construction site layout etc.. The quota for the construction period is the national construction and installation period quota (2000). Key words: anization, organization management, quality assurance, construction scheme 目录第1章编制依据......................................................................................................... 5 第2章工程概况......................................................................................................... 5 第3章施工前的准备工作......................................................................................... 7 技术准备......................................................................................................... 7 现场准备......................................................................................................... 8 劳动力准备及劳动力进场计划..................................................................... 8 主要施工机械设备准备及进场计划............................................................. 9 第4章施工进度计划及工期保证措施................................................................... 10 施工总进度计划................
东立一号楼施工组织设计-毕业设计论文 来自淘豆网www.taodocs.com转载请标明出处.