Vizio TV project MKD 背景
出口NAFTA成品,要交5%的关税;
当地政府采购要求采购本地产品;
取得更好的价格定位优势;
MB Disassembled / Identification
( In CMI Side )
----由合作公司建議
Testing process
Assembly process
Print the labels and assign one to the each MKD
Assembly the unit (1st stage)
Scan the MKD serial number and the MB serial number
Print 1 labels set (1 set contain 3 labels with the same SKD serial number plus rating label) and follow with the SKD all assembly and testing process.
Create a data base with the SKD serial number and M/B serial number
plete set
function test
Test MKD
Start
MKD Production Process (1/3)
Next
Stick the 2nd MKD serial number label in the back cover.
Remove the Back Cover
Remove MB
Des-assembly process (FG)
Unplug cables, remove MB from SKD and stick the 1st MKD serial number label in the MB.
Assembly Back Cover
Put the MB into the ESD bag and follow with his MKD together.
Assembly the Back cover and keep the rating label inside the MKD.
Next
MKD Production Process (2/3)
Pack MKD in original box and stick the 3rd MKD serial number in the box and stack.
plete MKD pallet
Des-assembly process (FG)
Scan a MKD Number, and ensure all the units that are belong to the pallet created by MB (3rd ).
Print the paper sheet.
Paper sheet Content: Refer to TMX assembled process
Print the paper sheet with the pallet number assign by MB
End
Clean Unit and packing unit
Scan