下载此文档

爆破扰动下既有隧道围岩稳定与安全振速研究-工程力学专业毕业论文.docx


文档分类:建筑/环境 | 页数:约79页 举报非法文档有奖
1/79
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/79 下载此文档
文档列表 文档介绍
Abstract
In order to alleviate traffic pressure,A large number of single tunnel needs rebuild to double tunnel or build a new tunnel beside the existing this time, The surrounding rock and the structure of the existing tunnel will be inevitably damaged on the disturbance of to ensure the surrounding rock of existing tunnel during the process of blasting has e an important project for
essful study of stability and safety vibration velocity of surrounding rock of existing tunnel on the disturbance of blasting is still in the stage of development,mostly through the empirical formula and field test to guide
engineering practice,and for the theoretical research of blasting vibration is still very order to explore the rules of dynamic response and safety vibration velocity of surrounding rock of existing tunnel on the disturbance of blasting,the paper use theoretical calculation and numerical simulation methods,and verified by field measurement and model results obtained as follows:
(1)In this paper,formula of safety vibration velocity of surrounding rock of existing schist tunnel are established based on elastic mechanics and structural
is concluded that the tensile stress of surrounding rock at the most dangerous point gradually increases、Ⅳitll the increase of the angle of rock stratum, the tunnel radius,the thickness of the over burden layer and the included angle of
stratified rock mass at different rates,attenuation with the increase of the thickness
of rock stratum,the power increases with the increase of the ratio of the tunnel radius to the thickness of rock statum,but when the product of included angle of stratified rock mass and the ratio of radius to thickness is fixed,the tensile stress is
the same time,according to the theory criterion of maximum principal tensile stress,the calculation formula of the maximum vibration velocity of the most dangerous point is bined

爆破扰动下既有隧道围岩稳定与安全振速研究-工程力学专业毕业论文 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数79
  • 收藏数0 收藏
  • 顶次数0
  • 上传人wz_198613
  • 文件大小23.88 MB
  • 时间2018-06-25
最近更新