印尼某油田待售(区块2)KSO KENDAL - CENTRAL JAVA - SUMMARY.pptx
KSO EXPLORATION KENDAL LOCATION MAP The area is located at North Central Java near Semarang city 3 The area is located at Central Java and adjacent to the Semarang city and several industries that require the supply of gas energy. Meanwhile, gas pipeline planned by the government will be constructed in 2016 which will be connecting East to West Java. KSO Kendal area contain 11 Prospect area with Un-risked Recoverable Reserved (P50): 193 MMBO & 362 BCF and Risked Recoverable reserved (P50): 54 MMBO & 141 BCF Economic evaluation at oil price 70 US$/bbl shows IRR = 21%, NPV ***@10% = US$ MM, POT = years, while at oil price 50 US$/bbl shows IRR = %, NPV ***@10% = US$ 34 MM, POT = years There are several hydrocarbon occurrences from oil shows well of Klantung-1 and several old Dutch oil well in Cipluk in the South of Kendal Area. Also two discovery gas well in the adjacent Kendal area (NCJA-1 with MMSCFPD and NCJB-1 well with 9 MMSCFPD). KSO KENDAL AREA Semarang Cirebon Cepu Gresik Gas pipe line open-access Semarang-Gresik 267 km is developed by Pertamina Gas since September 2014 until Early 2016 (18 months), target on stream first quarter 2016. Source of gas: Kangean, Husky Madura, Cepu Gas pipe line Cirebon-Semarang will developed by PGN in the following year. GAS PIPELINE POTENTIAL RECOVERABLE RESERVED NJCB KDS SBW GRS WLR KYP JGN KGM SKJ Klantung & Cipluk Unrisked Recoverable Reserved (P50) Risked Recoverable Reserved (P50) MMBO BSCF MMBO BSCF TOTAL
141 NO DESCRIPTION VOLUME PRICE UNIT QTY UNIT TOTAL Program 1 Year-1 a. G and G Study Package 1 US$ $500,000 b. Reprocessing Seismic km 650 US$ $150,000 c. 2D Seismic Acquisition km 200 US$ $3,000,000 d. 3D Seismic Acquisition km2 e. Drilling Exploration well well Subtotal US$ $3,650,000 2 Year-2 a. G and G Study Package 1 US$ $500,000 b. Reprocessing Seismic km c. 2D Seismic Acquisition km d. 3D Seismic Acquis
印尼某油田待售(区块2)KSO KENDAL - CENTRAL JAVA - SUMMARY 来自淘豆网www.taodocs.com转载请标明出处.