下载此文档

《公路工程管理与实务》(Highway engineering management and practice).doc


文档分类:建筑/环境 | 页数:约40页 举报非法文档有奖
1/40
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/40 下载此文档
文档列表 文档介绍
《公路工程管理与实务》(Highway engineering management and practice)
Highway engineering management and practice
Title meaning:
Top priority, master
Key points, master
Look at it, there's not much chance of it
Understand the content
Direct line: look, maybe
...... : the key word
Notes to note:
1. The "P" in this note indicates that the page number in the book, such as "P1", represents the first page in the book.
2. The "... "in this note. This part of the book should be written down in the book and belongs to the content that should be mastered. In this note, "..." Said.
3. The contents of this note are the contents of "()", which indicate that this part is a class note, which is an important record for teachers, and students must attach great importance to it.
Iv. After the sequence number in this note is not written, the content of the serial number should be drawn down after the serial number. If you see "(1)" in this note, the words after (1) should be drawn down; When you see "1", the words should be drawn down. See "(1)" means that the words after (1) should be marked down and so on.
P3
1 b411011
1. The wet type of roadbed... ; New highway roadbed... It is. Highway... Dry or medium wet.
2. The unstable earth rocks of the hillside are under the action of gravity... Sliding deformation phenomenon.
Including the wrong... Loose accumulation.
P4-5
1 b411012
The original foundation treatment requirements
1. The subgrade... Cut down...
2. The embankment... Backfill...
Base... Fill in...
5. Base... Compaction...
When the embankment... Dig up the steps...
P5
1 b411013
A,
(1) for highway roadbed... Easy to dig, easy to press, high strength, good water stability.
(2) 2. (2) loess and saline soil... No use as a roadbed filler. (single, multiple-choice, case can be done.)
P6
Second,
(I) construction technology of earth side embankment
1.
2.
3.
4.
(2) the construction technology of the embankment
1.
(applicable scope)
P7
(3)
The method of fil

《公路工程管理与实务》(Highway engineering management and practice) 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数40
  • 收藏数0 收藏
  • 顶次数0
  • 上传人xinsheng2008
  • 文件大小52 KB
  • 时间2018-08-29