《公路工程管理与实务》(Highway engineering management and practice)
Highway engineering management and practice
Title meaning:
Top priority, master
Key points, master
Look at it, there's not much chance of it
Understand the content
Direct line: look, maybe
...... : the key word
Notes to note:
1. The "P" in this note indicates that the page number in the book, such as "P1", represents the first page in the book.
2. The "... "in this note. This part of the book should be written down in the book and belongs to the content that should be mastered. In this note, "..." Said.
3. The contents of this note are the contents of "()", which indicate that this part is a class note, which is an important record for teachers, and students must attach great importance to it.
Iv. After the sequence number in this note is not written, the content of the serial number should be drawn down after the serial number. If you see "(1)" in this note, the words after (1) should be drawn down; When you see "1", the words should be drawn down. See "(1)" means that the words after (1) should be marked down and so on.
P3
1 b411011
1. The wet type of roadbed... ; New highway roadbed... It is. Highway... Dry or medium wet.
2. The unstable earth rocks of the hillside are under the action of gravity... Sliding deformation phenomenon.
Including the wrong... Loose accumulation.
P4-5
1 b411012
The original foundation treatment requirements
1. The subgrade... Cut down...
2. The embankment... Backfill...
Base... Fill in...
5. Base... Compaction...
When the embankment... Dig up the steps...
P5
1 b411013
A,
(1) for highway roadbed... Easy to dig, easy to press, high strength, good water stability.
(2) 2. (2) loess and saline soil... No use as a roadbed filler. (single, multiple-choice, case can be done.)
P6
Second,
(I) construction technology of earth side embankment
1.
2.
3.
4.
(2) the construction technology of the embankment
1.
(applicable scope)
P7
(3)
The method of fil