下载此文档

八里台泵房模板施工方案.doc


文档分类:建筑/环境 | 页数:约27页 举报非法文档有奖
1/27
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/27 下载此文档
文档列表 文档介绍
---------------------考试---------------------------学资学****网---------------------押题------------------------------·······················································································································································································································································································、质量管理点和控制措施···································、文明施工与环保措施······························································································、脚手架类倒塌事故应急处理与救援预案······························《建筑施工扣件式钢管脚手架安全技术规范》JGJ130-《建筑地基基础工程施工质量验收规范》GB50202—《建筑工程施工质量验收统一标准》GB20300—《建筑施工安全检查标准》JGJ59—《建筑施工模板安全技术规范》JGJ162—,位于津南区八里台镇工业园区内;设备间为地下一层,地上一层,,东区西区各一个,,,地上:;建筑结构形式为框架结构,抗震设防烈度为7度设计使用年限50年,:地下室外墙350厚,(mm):设备房(方形柱):500×(mm):设备房框架梁:350*650、400*900、300*500设备房次梁:250*(mm):设备房底板:(mm):地下室顶板:160mm:,各施工段竖向划分为底板以下(外墙上返300高)和底板以上二个施工段。,各施工段施工部位工期安排见下表1:表1施工部位及工期安排表工期(天)施工时间施工部位—、项目技术负责人全面负责项目技术、质量工作2、专项技术员)对模板工程进行技术交底。12)对施工过程进行监控3)负责模板工程技术监控3、专项质量员)对模板工程进行质量监控,检查、督促质量的整改1)对建材质量进行检查、,主要劳动力分工及数量(见表2)。、生产人员熟悉图纸,认真学****掌握施工图的内容、要求和特点,同时针对有关施工技术和图纸存在的问题做好记录,通过会审对图纸中存在的问题,与设计、甲方、监理共同协商解决,取得一致同意后,办理图纸会审记录,作为施工图的变更依据和施工操作依据,熟悉各部位截面尺寸标高,制定初步设计方案。:-24m开口宽17-15/单头扳手MJ-10623KW台圆盘锯MB-503/平刨/12手电钻把VV508S2台520W台钻M-651A/手提电锯//手提电刨/,支撑采用钢4厚双面覆膜多层板,模板周转数为15顶板、梁、墙、

八里台泵房模板施工方案 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数27
  • 收藏数0 收藏
  • 顶次数0
  • 上传人0640105
  • 文件大小92 KB
  • 时间2020-04-19