下载此文档

Halliburton Single Trip Multi-Zone(防砂完井技术).ppt


文档分类:医学/心理学 | 页数:约63页 举报非法文档有奖
1/63
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/63 下载此文档
文档列表 文档介绍
STMZ – Single Trip Multi Zone
March 10, 2009
Safety Topic: A Single Second
A Single Second
It takes a minute to write a safety rule.
It takes an hour to hold a safety meeting.
It takes a week to plan a good safety program.
It takes a month to put that program into operation.
It takes a year to win a safety award.
It takes a lifetime to make a safe worker.
A Single Second
But it takes
only a second
to destroy it all - with one accident.
Take the time now to work safely and help your fellow employees to be safe.
Halliburton Single Trip Multi-Zone System
Agenda
Introduction to Multi-Zone Systems
2. STMZ GP Systems Benefit of Design
3. Available Halliburton Systems
4. STMZ GP ponents
Basic Operations
Case Histories
DTMZ Equipment
STMZ – Single-Trip Multizone
Multiple pletions
One perforating trip – all zones
One clean-up trip
pletion assembly
Zones are isolated
Sequential packing process
Single trip….
Single Trip Multiple pletion Systems Introduction
What is a Single Trip Multi-Zone System?
A multiple zone system plishes the same objectives as a stack pletion
The perforating for all zones is done in one trip with TCP or multiple trips with wire line. All zones are perforated first.
The well is cleaned up
pletion tools are run for all the zones in a single trip.
The packing operations pleted in the same trip.
Each zone can be isolated selectively or mingled.
When do you run a Multizone System?
Long zones with multiple lobes that need to be broken up
Isolation of discrete zones
Production Control – all at once or one at a time
Water Shutoff – close off as they water out
Increased Speed of packing multiple zones
Reduced Rig Time
Lower Overall Cost
When should a Multizone System not be Run?
Varying Fluid Gradients - BHP Differences between zones
Difficult to Control Wells - can not be easily controlled for sand and gas influx.
Closely Spaced Zones (between perforations)
Less than 7 meters for STMZ
Risk…..?

Halliburton Single Trip Multi-Zone(防砂完井技术) 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数63
  • 收藏数0 收藏
  • 顶次数0
  • 上传人机械CAD论坛
  • 文件大小0 KB
  • 时间2011-11-15