STMZ – Single Trip Multi Zone March 10, 2009 Safety Topic:A Single Second A Single Second It takes a minute to write a safety rule. It takes an hour to hold a safety meeting. It takes a week to plan a good safety program. It takes a month to put that program into operation. It takes a year to win a safety award. It takes a lifetime to make a safe worker. A Single Second But it takes only a second to destroy it all - with one accident. Take the time now to work safely and help your fellow employees to be safe. Halliburton Single Trip Multi-ZoneSystem Agenda Introduction to Multi-Zone Systems 2. STMZ GP Systems Benefit of Design 3. Available Halliburton Systems 4. STMZ GP ponents Basic Operations Case Histories DTMZ Equipment STMZ – Single-Trip Multizone Multiple pletions One perforating trip – all zones One clean-up trip pletion assembly Zones are isolated Sequential packing process Single trip…. Single Trip Multiple pletion SystemsIntroduction What is a Single Trip Multi-Zone System? A multiple zone system plishes the same objectives as a stack pletion The perforating for all zones is done in one trip with TCP or multiple trips with wire line. All zones are perforated first. The well is cleaned up pletion tools are run for all the zones in a single trip. The packing operations pleted in the same trip. Each zone can be isolated selectively or mingled. When do you run a Multizone System? Long zones with multiple lobes that need to be broken up Isolation of discrete zones Production Control – all at once or one at a time Water Shutoff – close off as they water out Increased Speed of packing multiple zones Reduced Rig Time Lower Overall Cost When should a Multizone System not be Run? Varying Fluid Gradients - BHP Differences between zones Difficult to Control Wells - can not be easily controlled for sand and gas influx. Closely Spaced Zones (between perforations) Less than 7 meters for STMZ Risk…..?
Halliburton Single Trip Multi-Zone(防砂完井技术) 来自淘豆网www.taodocs.com转载请标明出处.