下载此文档

道路与桥梁专业英语课后句子.docx


文档分类:高等教育 | 页数:约5页 举报非法文档有奖
1/5
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/5 下载此文档
文档列表 文档介绍
第四课课文
This force prevents the cracks from developing by eliminating or considerably reducing the tensile stresses at the critical sections at services load, thereby raising the bending, shear and torsional capacities of the sections.
这种力能消除或大大减少使用荷载在跨中及支座等临界截面处产生的拉应力,阻止裂缝出现,从而提高截面的抗弯、抗剪和抗扭能力。
Although it might appear that the blocks will slip and vertically simulate shear slip failure, in fact they will not because of the longitudinal force P.
虽然看起来好像块体会滑移并发生垂直剪切滑动破坏,但事实上由于纵向力p的作用,这种情况不会出现。
But again, because of the compressive prestress imposed by the metalbands as a form of circular prestressing, they will remain in place.
但又是由于金属箍施加的压应力产生了环形预应力,因而木桶仍保持原样。
Linear prestressing had progressed a long way from the early days.
线预应力从出现以来,已经有了很大的发展。
The success in the development and construction of all these structures has been due in no small measure to the advances in the technology of materials, particularly prestressing steel, and the accumulated knowledge in estimating the short and long-term losses in the prestressing forces.
所有这些结构物的建造成功,在很大程度上应归功于材料技术的进步,也应归功于预应力损失计算方法的不断完善。
阅读材料
According to the AASHTO technology implementation group, HPC, which is concrete thathas been designed to be more durable, and, if necessary, stronger than conventional concrete, can help highway agencies to build bridges that are better able to hold p to traffic and environmental demand

道路与桥梁专业英语课后句子 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数5
  • 收藏数0 收藏
  • 顶次数0
  • 上传人rdwiirh
  • 文件大小19 KB
  • 时间2021-02-26