下载此文档

企业生产应急处置预案.doc


文档分类:汽车/机械/制造 | 页数:约9页 举报非法文档有奖
1/9
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/9 下载此文档
文档列表 文档介绍
.
校长为学校学生道路交通安全工作第一责任人,负责校〔园内的道路交通安全管理工作和学生出行的道路交通安全教育,以及学生春<秋>游和其他教育教学活动的道路交通安全管理工作center pin checks and anchoring the inner cylinder. According to While coupling alignment should keep oil out of cavity and locate the rotor axis neck raised are within the prescribed limits, there should be no gaps, Horn, Horn and Horn feeler gauges fit into. Center coupling, condenser water filling and water-filled according to factory requirement. For coupling three supported rotor Center, the mouth under the coupling between the value should be as stipulated in the manufacturer, usually ~. In the case of coupling connection, if possible, lifting only one bearing end of the support bearing of the rotor, remove the bearing, fitted with special tiles and special lifting tools, disc rotors, check the journal flutter tile, should generally be less than . When the couplings and rotor comes when there is a conflict, the coupling Centre shall prevail. shaft looking for: ... . Provisional bolt confirmed the positioning of the rotor size, as well as the coupling between the adjustment shim thickness accuracy, drawings to meet the technical requirements. Plane, cylindrical and clean the coupling bolt holes should be clean and without burrs, scrap iron and grease-free, relative position of the coupling according to the drawing requirements are. Coupling top scr

企业生产应急处置预案 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数9
  • 收藏数0 收藏
  • 顶次数0
  • 上传人pk5235
  • 文件大小43 KB
  • 时间2022-01-02