下载此文档

液压夯实机补强台背路基影响因素分析.pdf


文档分类:建筑/环境 | 页数:约11页 举报非法文档有奖
1/11
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/11 下载此文档
文档列表 文档介绍
: .
第38 卷 第5 期 Factors of Reinforcing Subgrade on Back of
Abutment Using Hydraulic Compactor
1 2 3 2 ,4
JI Meng , XU Tian-yu , CHEN Ce-ce , ZHOU Zhi-jun
(1. Fourth Engineering Co. , Ltd. , of CCCC Second Highway Engineering Co. , Ltd. , Luoyang Henan 471013, China;
2. School of Highway, Chang’an University, Xi’an Shaanxi 710064, China; 3. China Highway Engineering Consultants Co. , Ltd. ,
Beijing 100089, China; 4. Xi’an Changda Highway Engineering Testing Center, Xi’an Shaanxi 710064, China)
Abstract
: To study the dynamic influence of hydraulic compactor on abutment in the process of reinforcing
subgrade on back of abutment, based on the subgrade filling project of the abutment back in the bridge and
tunnel transition section on an expressway, the interaction model of rammer, subgrade and abutment is
established by FE software ABAQUS. The accuracy of the model is verified by full - scale compaction test. In
the process of simulation, taking the maximum dynamic displacement and maximum dynamic strain of
abutment as the evaluation indicators, the influence of factors such as dropping distance, distance between
compacting point and abutment, initial compactness of subgrade, strength grade of abutment concrete and top
support conditions of abutment are analysed. The result shows that (1) the error between the measured and
simulated values of soil pressure caused by ramming is within 10% , and the variation trend of dynamic
displacement and dynamic strain of abutment along the abutment height is in line with the convention, the
simulation model is reliable; (2) under the action of compaction, the maximum dynamic displacement and
maximum dynamic strain of ab

液压夯实机补强台背路基影响因素分析 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数11
  • 收藏数0 收藏
  • 顶次数0
  • 上传人熙凤
  • 文件大小6.80 MB
  • 时间2022-01-27