several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremenecific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
第一条 为加强水利建设市场管理,进一步标准水利工程建设程序,推进项目法人责任制、建设监理制、招标投标制的实施,促进水利建设实现经济体制和经济增长方式的两个根本性转变,根据国家有
水利工程建设程序管理暂行规定 来自淘豆网www.taodocs.com转载请标明出处.