下载此文档

兴平污水处理施工方案.docx


文档分类:建筑/环境 | 页数:约39页 举报非法文档有奖
1/39
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/39 下载此文档
文档列表 文档介绍
陕西兴化10万吨/年合成气制乙醇科技示范项目污水处理安装工程施工组织设计方案编制:审核:批准:北京建工金源环保发展股份有限公司二零一六年九月十日1目录一、工程概况············································2二、编制依据············································2三、施工准备········································································································································································································6四、施工方法·····································································································································································25五、设备试运行·················································································································································,应及时完成的工作··············33六、工程质量保证体系及措施····························33七、安全生产保证措施··································(源)的辨识·······························································34八、文明施工、环境保护措施···························362一、:陕西兴化10万吨/年合成气制乙醇科技示范项目污水处理站安装工程。::本装置接收的废水分别来自厂区生产水气化废水、二甲醚废水以及装置区地面冲洗水、罐区喷淋排水、初期雨水、生活废水等。,,pj=,sj=,变压器选用630KVA,2台。处理规模100m3/h。:二、《污水综合排放标准》《GB8978-1996》《室外排水设计规范》《GB50101-2005》《给排水管道工程施工验收规范》《GB50268-97》《建筑给排水设计规范》《GB50015-2003》《工业企业厂界噪声标准》《GB12348-90》《钢结构设计规范》《GB50017-2003》《建筑设计防火规范2001版》《GBJ16-87》-2014《过程测量与控制仪表的功能标志及图形符号》-2014《自动化仪表选型设计规范》-2014《仪表供气设计规范》-2014《仪表系统接地设计规范》-2014《可编程序控制器系统工程设计规范》-2012《自控安装图册》、-2013《建筑照明设计标准》-2011《低压配电设计规范》-2008《机电产品包装通用技术条件》-2009《供配电系统设计规范》-2011《通用用电设备配电设计规范》-2010《建筑物防雷设计规范》-2008《电力装置的继电保护和自动装置设计规范》-2008《民用建筑电气设计规范》-2007《电力工程电缆设计规范》-2012《建筑物电子信息系统防雷技术规范》-2013《20KV及以下变电所设计规范》

兴平污水处理施工方案 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数39
  • 收藏数0 收藏
  • 顶次数0
  • 上传人实用文库
  • 文件大小329 KB
  • 时间2016-10-25