杭州市电力局供(配)电工程贴费(同名15560)
several group number, then with b ± a, =c,c is is methyl b two vertical box between of后,应向供电部门缴纳新装增容供电工程贴费。用户申请新装或增加用电容量,不管是否引起供电部门新建、扩建或改建各级电压的外部供电工程,除规定停收、免收外,均按本方法规定缴纳贴费。任何部门不得减、免、缓。
四、杭州电网内贴费的收取,由杭州市电力局所属各用电营销部门办理。
五、贴费收取的标准:
:
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b
杭州市电力局供(配)电工程贴费(同名15560) 来自淘豆网www.taodocs.com转载请标明出处.