模袋混凝土护坡施工及质量控制
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
关 键 词: 模袋混凝土;施工监理;质量控制;慈溪市徐家浦围涂
中图分类号: TV861 文献标识码: A
浙江慈溪市徐家浦两侧围涂工程位于杭州湾南岸浅滩上,是目前国内规模和围涂面积最大的单项围涂工程。工程规模:距平行于海滩边3000m的横堤总长26521m;四灶浦直堤长约2240m,水云浦直堤长约3000m。4座水闸位于横堤上,分别为8孔×4m、8孔×4m、7孔×4m、7孔×4m。工程为Ⅲ等工程,主要建筑物为3级,水云浦直堤按20a一遇高潮位与20a一遇风浪组合〔不允许越浪〕设计,西南侧起点为水云浦九塘闸西侧,距原闸中心线约95m,堤坝为西南—东北走向,堤长3000m。半掘浦隔堤按10a一遇标准设计;南起半