下载此文档

含电动汽车虚拟电厂的区间主从 博弈优化调度 华远鹏.pdf


文档分类:论文 | 页数:约8页 举报非法文档有奖
1/8
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/8 下载此文档
文档列表 文档介绍
网络首发时间:2022-05-07 09:47:30
网络首发地址:.
rgy
storage resources for virtual power plants. There is an interest game between virtual power plant operators and
electric vehicle owners, and the operation process is affected by many uncertain factors, which poses a challenge
to the optimal scheduling. Therefore, a bi level optimization model of interval master-slave game for virtual power
plant with electric vehicle is proposed. The upper level model takes the minimum operation cost of the virtual
power plant as the optimization objective, considers the constraints of power balance and energy storage system,
and updates the corresponding electricity price information according to the obtained upper level objective; Based
on the electricity price information, the lower optimization model takes the minimum power consumption cost of
electric vehicle owners as the optimization objective, solves the aggregated electric vehicle power, and sends it to
the upper optimization model. The results show that the interval master-slave game bilevel optimization model
can take into account the bilateral interests of virtual power plant operators and electric vehicle owners, and
effectively improve the robust

含电动汽车虚拟电厂的区间主从 博弈优化调度 华远鹏 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数8
  • 收藏数0 收藏
  • 顶次数0
  • 上传人司棋夸克
  • 文件大小1.13 MB
  • 时间2022-05-16