下载此文档

Task 2 Time variation study LMSC, LANMAN Standards 任务2的时间变化的研究——LMSC,LanMan标准.ppt


文档分类:IT计算机 | 页数:约7页 举报非法文档有奖
1/7
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/7 下载此文档
文档列表 文档介绍
Task 2 Time variation study LMSC, LANMAN Standards 任务2的时间变化的研究——LMSC,LanMan标准
Agenda
attendees
Task 2
status afternd that the equalizer adaptation time be faster than this. Paul Kolesar also agreed to write down his thoughts on an informative dynamic channel test.
1 Dec 2019
4
Channel model ad hoc Task 2: Time-varying study & modal noise
3) Task 2 & 4: joint activity on launch study - 1
a) Suggested goals and tasks for the study of launch were presented and discussed
Notes of goals and tasks agreed :
Main goal :
To provide a specific input to the task force on launch conditions and launch testing, for the January '05 meeting
Tasks and study areas :
Simulations of coverage vs PIE-D plots as output (for various launch conditions
Agree common model for simulations (. connector offsets, rise times, per offset statistics)
Recommend (simple) launch compliance test
Measurements of real fibres
Develop a channel model for OM2
Notes on discussion following
Yu Sun described work so far in task 4 which has agreed a 4 connector link model with offsets at a) worst case and b) average values.
Joerg Kropp offered to present some calculations and experimental results on OM3 fibres for the next meeting
David Cunningham offered measurements and theory of different launches on TIA and other fibre sets, for the first or second week of January. Launch ty

Task 2 Time variation study LMSC, LANMAN Standards 任务2的时间变化的研究——LMSC,LanMan标准 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数7
  • 收藏数0 收藏
  • 顶次数0
  • 上传人杨勇飞2
  • 文件大小163 KB
  • 时间2022-05-20