下载此文档

成都建筑工程并联竣工验收办事指南.doc


文档分类:建筑/环境 | 页数:约5页 举报非法文档有奖
1/5
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/5 下载此文档
文档列表 文档介绍
成都建筑工程并联竣工验收办事指南
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-disc下载)
2、原公安消防监督机构核发的所有的《建筑工程消防设计审核意见书》,以及消防专项论证、会审纪要
3、工程建筑规划许可证、建设施工许可证(复印件)
4、工程竣工验收报告
5、经建设单位签字认可的施工安装单位对隐蔽工程、固定消防灭火系统、自动报警系统、防排烟系统的安装、调试、开通的记录及水系统的耐压试验报
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-discipline of leading cadres honesty in politics and education work, enhance leaders ability to resist
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-discipline of leading cadres honesty in politics and education work, enhance leaders ability to resist
of accountability, redress of orders and prohibitions. Strengthening the honesty and self-discipline of leading cadres honesty in politics and education work, enhance leaders ability to resist

3、建设、设计、施工、监理、防护设备厂等单位出具的该项目人防工程质量评估报告各一份;
未建人防工程的建设项目须提交市人防办出具的“异地建设费核定单”和缴费凭证(收据联);2010年后缴费的须提交人防出具的“建设项目人防工程竣工验收备案意见书”;人防工程建在建设项目其他标段的须出具载明此内容的人防工程施工图审查意见书、总平图及情况说明(查原件收复印件)
(七)建筑工程设施项目竣工验收
1、涉水事项(包括项目中的取水工程、排水工程、节水工程、河渠整治工程、水土保持工程)竣工图,并附电子文档
2、上述涉水工程如果存在竣工图与设计图不符的情况,需提供由甲方出具关于设计变更的情况说明。
3、排水质量验收报告(监理单位出具)
(八)建筑项目卫生竣工验收(食品生产企业、公共场所及供水单位)
1、生活饮用水二次供水涉水产品的卫生行政部门许可证批件(水箱、水泵、管材的卫生许可批件 复印件)
2、餐饮、食品生产工业、公共场所应提供建筑、通风空调、二次供水竣工图(光盘)
(九)建筑项目安全设施竣工验收(危险化学品建设项目)
1、安全设施竣工验收评价报告
2、建设项目安全设施施工情况报告(5份)
(十)市林业园林竣工验收
1、市规划局

成都建筑工程并联竣工验收办事指南 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数5
  • 收藏数0 收藏
  • 顶次数0
  • 上传人快乐蚂 蚁
  • 文件大小2.35 MB
  • 时间2022-05-20