第 11 卷 第 5 期 储 能 科 学 与 技 术 2022 年 5 月 Enerrbines, electric-to-gas equipment and electric vehicles, describing the uncertainty of wind power, photovoltaic power output, electrical load, and gas load in the virtual power plant by use of the interval optimization theory; Taking operating economic benefits, user comfort and carbon dioxide emissions as the optimization targets, and considering constraints such as power balance and equipment operating characteristics, an interval optimal scheduling plan for the gas-electricity interconnected virtual power plant is constructed, and designing an improved non-dominated sorting genetic algorithm to solve the scheduling scheme of gas-electric interconnection virtual power plant. An analysis of a case study is selected for the winter heating scenario of a gas-electricity interconnected virtual 收稿日期:2021-11-18;修改稿日期:2021-11-25。 第一作者及通讯联系人:韩帅(1986—),女,硕士,高级工程师,研 基 金 项 目 : 广 西 电 网 有 限 责 任 公 司 电 力 科 学 研 究 院 科 技 项 目 究方向为需求侧管理、综合能源应用,E-mail:han_s.******@。 (ZBKJXM20180569)。1429 第 5 期 韩 帅等:含电动汽车的气电互联虚拟电厂区间多目标优化调度策略 power plant in a certain area. The results show that the charging behavior of cluster electric vehicles increases the electric load during the dispatch period, and the out