南开—12秋学期《资本预算和资产管理》在线作业
12 capital budgeting and asset management online, fall semester
Radio examination
First, radiints
of the existing two banks can provide loans to the project construction unit, in which a bank interest rate of 10. 3%, annual interest, while bank B the annual interest rate of 10%, the monthly savings, the construction unit of the project (conclusion)
the effective interest rate of B Bank is lower than the real interest rate of a bank
is good at borrowing money from B
is a good Borrower
a line is the same as the real interest rate for line B.
The correct answer: C full marks: 2 points
the purpose of feasibility study is ()
examines the social impact of the project
preliminary project post evaluation
demonstrates the rationality of the technology in detail
provides the basis for project decision making
The correct answer: D full marks: 2 points
the technology used in the project can obtain the best economic benefit under certain consumption level, which means the technical condition of the project
Advanced technology of A.
Applicability of B. Technology
C. technology economy
Reliability of D. Technology
12. , a bank to a, B, C, Ding four enterprises to provide loans, loan interest rates of 10%, respectively, year, quarter, month, week, the interest rate, the real interest rate is highest ()
A A.
B
C
Ding
The correct answer: D full marks: 2 points
because the purpose of project evaluation is to provide (),it can be said that project evaluation is more authoritative than feasibility study
feasibility plan
technical regulations
decision making basis
loan program
The correct answer: C full marks: 2 points 14. can be considered () the shadow price of money
interest rate
social discount rate
borrowing cost
deposit rate
The correct answer: B full marks: 2 points
if the investment plan is based on the internal rate of return, the internal rate of return required by the scheme is feasible
greater than 0
greater than