下载此文档

龙湖地产发展有限公司施工图设计指引总则.doc


文档分类:建筑/环境 | 页数:约6页 举报非法文档有奖
1/6
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/6 下载此文档
文档列表 文档介绍
龙湖地产发展有限公司施工图设计指引总则
Quality Control Part
CONTENT :
Quality Management System
Quality Policy
Quality Control Flow and QC Flow Chart
Quality assurance for materials (ing Inspection)
In-process Inspection
Final Inspection
Traceability of Product
plaint and Corretive Action
QUALITY CONTROL
11>. Quality Management System
2001 EVE BATTERY CO., LTD. established
2002 EVE was ISO9001:2000 certified by international standard
institution-DNV
2002 Lithium battery got UL Approval
2003 Charger got 3C certificate
2004 Mobile phone battery got CE certificate
QUALITY CONTROL
2. Quality Policy
以客户为中心,采用先进技术,不断创新,
及时的为客户提供优质产品和服务。
Regarding customer as the center, advanced technique of adoption, continuously creative, On time of provide the high-quality product with serve for customer.
QUALITY CONTROL
3、Quality Control Flow and
QC Flow Chart
QUALITY CONTROL
Quality Control Flow
QUALITY CONTROL
、 QC Flow Chart
QUALITY CONTROL
4. Quality assurance for materials (ing Inspection)
Main Material Supplier
QUALITY CONTROL· ing Inspection
ing inspection flow chart
OK
NG
OK
Manufacturer
Purchase
ing inspection
OK
Supplier Audit
Discrepant Material Report And Corrective Action
Marking with labels
Inspection report
Enter warehouse
QUALITY CONTROL · ing Inspection
IQC ing inspection Type
Main Inspection type
QUALITY CONTROL · ing Inspe

龙湖地产发展有限公司施工图设计指引总则 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数6
  • 收藏数0 收藏
  • 顶次数0
  • 上传人ZRydVIFv
  • 文件大小0 KB
  • 时间2015-03-16