ing inspection specification /work instruction for the telephone wire B*LC-103-BK-1/B*LC-103-BK-WE/B*LC-094-BK were set up and relevant training was given to inspectors. See the attached please.
Reviewed and updated all related ing inspection specification /work instruction.
Aug 10th,2000
Make a list for controlling the accepted precision of all the extended celebrated instruments, and draw the conclusions for the verify reports outside.
Check the validity of the labels of every instrument in use.
Relevant training was given to the inspector.
,2000
Review the training record of this employee and give her an opera-
tion certificate.
Draw a form of " special working procedure of MF-3", check their qualification of the operators.
Aug