SH/T 3503-J601
DCS机柜/仪表盘/操作台
安装检验记录
Inspection Record of
DCS /Instrument Panel/Operation Console Installation
工程名称:
Project:
单元名称:
Unit:
Description
Model
Item No.
Inspection items and requirements
Result
Date
1
The appearance shall be free from damage and deformation, the inner and outer surfaces are free from paint falling and corrosion deficiency.
2
The foundation structural steel shall remain level, straight and sound with exterior patible with , instrument panel and operation console, the surface has been de-rusted and anti-corrosion treated.
3
The position, nameplate, model, item number, quantity, exterior size and opening size of the , panel and operation console shall be pliance with the design requirement.
4
The model, specification, quantity and installation position of the instrument and DCS internals ply with design requirement, without damage, loosing, falling and humidity.
5
The installation of DCS , instrument panel, and operation console ply with design requirement, the verticality, levelness, inter-panel clearance, tops differential height, face plane ply with specification, the equipment shall be firmly connected with the foundation structural steel by rust-proof bolts.
6
The model, specification and quantity of inter-panel cable (incl. special cable) , as well as the cable shoe shall be correct, the wiring (incl. internal wiring) sh