下载此文档

异形独塔斜拉桥张拉顺序研究.pdf


文档分类:建筑/环境 | 页数:约11页 举报非法文档有奖
1/11
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/11 下载此文档
文档列表 文档介绍
Hans Journal of Civil Engineering 土木工程, 2016, 5(5), 222-232
Published Online September 2016 in Hans.
/


Study on Tensioning Sequence of Cable for
Abnormal Single Pylon Cable Stayed Bridge
Xiangdong Liao1, Jun Hu2*, Yi Luo2, Fuyuan Guo1, Jie Zhang1, Biru Wang1, Qunying Tao1,
Chuan Zeng1
1China Construction Third Engineering Bureau Steel Structure Company, Wuhan Hubei
2School of Civil Engineering and Mechanics, Huazhong University of Science and Technology, Wuhan Hubei


Received: Sep. 8th, 2016; accepted: Sep. 25th, 2016; published: Sep. 28th, 2016

Copyright © 2016 by authors and Hans Publishers Inc.
This work is licensed under the Creative Commons Attribution International License (CC BY).
/
Open Access



Abstract
The tension sequence problem of the abnormal cable stayed bridge is very complicated. As cable
stayed bridges are highly statically redundant structures, the structure systems are constantly
changing with the construction process and the tension of the cable will affect the stress state of
the structure. And it is important to determine the tension time of the back cable in the cable stayed
bridge. In this paper, we make a construction stages analysis of different tension schemes, and com-
pare various solutions by the parameters of the stress state of the bridge, like the stress of the ca-
ble, main girder and the main tower stress and deformation and so on. At last, we get the optimal
cable tension schemes, which will provide guidance for the construction process and be time savi

异形独塔斜拉桥张拉顺序研究 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数11
  • 收藏数0 收藏
  • 顶次数0
  • 上传人陈潇睡不醒
  • 文件大小592 KB
  • 时间2021-04-06