下载此文档

山东建筑大学毕业设计外文文献及译文.doc


文档分类:外语学习 | 页数:约13页 举报非法文档有奖
1/13
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/13 下载此文档
文档列表 文档介绍
山东建筑大学毕业设计外文文献及译文-1–外文文献: GRAPHICAL-BASED MULTISTAGE SCHEDULING METHOD FOR RC BUILDINGS Y. C. HUANG Department of Construction Management, Hwa Hsia Institute of Technology merce, 111 Hwa Hsin Street,Chung Ho City, Taipei Hsien, Taiwan, Republic of China Received 13 February 2004; accepted 4 March 2005 In Taiwan, contractors are ing specialized in certain types of construction in an petitive environment and this specialization requires some scheduling models to provide better scheduling results for each type of construction. A new practical method, Graphical-Based Multistage Scheduling Method (GMSM),for scheduling RC building superstructures is presented herein. From the analysis of characteristics and construction custom of RC buildings, four constraints, (a) down – up construction, (b) building inspection, (c) reuse of beam forms, and (d) reuse of slab forms, can be established. The GMSM is developed utilizing a graphical-based method and the concept of resource reuse, and the general form of the GMSM to be facilely implemented in any worksheet software is derived as well. The results of this study provide some quantitative information asa useful guide for scheduling RC building superstructures. Keywords: Multistage scheduling, repetitive project, RC building, GMSM Introduction In Taiwan, contractors are ing specialized in certain types of construction in an petitive environment and this specialization requires some scheduling models to provide a better scheduling for each type of construction. The majority of high-rise buildings located in urban areas in Taiwan are RC structures. It is deemed crucial for high-rise buildings that a scheduling model for this type of construction can not only increase profits but also reduce the impact on urban traffic. Of the high-rise buildings constructed to date, work planning technique has monly adopted in scheduling. The Critical Path Method (CPM) is the most popular one; for instance, prevalent scheduling software such as MS P

山东建筑大学毕业设计外文文献及译文 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数13
  • 收藏数0 收藏
  • 顶次数0
  • 上传人taotao0b
  • 文件大小46 KB
  • 时间2017-02-20