下载此文档

土方工程的地基勘察与施工-毕业设计外文翻译.docx


文档分类:建筑/环境 | 页数:约13页 举报非法文档有奖
1/13
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/13 下载此文档
文档列表 文档介绍
DESIGN AND EXECUTION OF GROUND INVESTIGATION FOR EARTHWORKS
PAUL QUIGLEY, FGS
Irish Geotechnical Services Ltd
ABSTRACT
The design and execution of ground investigation works for earthwork projects has e increasingly important as the availability of suitable disposal areas es limited and costs of importing engineering fill increase. An outline of ground investigation methods which can augment ‘traditional investigation methods’ particularly for glacial till / boulder clay soils is presented. The issue of ‘geotechnical certification’ is raised and mendations outlined on its merits for incorporation with ground investigations and earthworks.
1. INTRODUCTION
The investigation and re-use evaluation of many Irish boulder clay soils presents difficulties for both the geotechnical engineer and the road design engineer. These glacial till or boulder clay soils are mainly of low plasticity and have particle sizes ranging from clay to boulders. Most of our boulder clay soils contain varying proportions of sand, gravel, cobbles and boulders in a clay or silt matrix. The amount of fines governs their behaviour and the silt content makes it very weather susceptible.
Moisture contents can be highly variable ranging from as low as 7% for the hard grey black Dublin boulder clay up to 20-25% for Midland, South-West and North-West light grey boulder clay deposits. The ability of boulder clay soils to take-in free water is well established and poor planning of earthworks often amplifies this.
The fine soil constituents are generally sensitive to small increases in moisture content which often lead to loss in strength and render the soils unsuitable for re-use as engineering fill. Many of our boulder clay soils (especially those with intermediate type silts and fine sand matrix) have been rejected at the selection stage, but good planning shows that they can in fact fulfil specification requirements in terms paction and strength.
The selection process should aim to maximise th

土方工程的地基勘察与施工-毕业设计外文翻译 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数13
  • 收藏数0 收藏
  • 顶次数0
  • 上传人酒酿小樱桃
  • 文件大小49 KB
  • 时间2017-09-21
最近更新