BGA Solder Reflow and Rework mendations BGA Reflow Soldering mendations BGA Rework mendations Reflow: Removal and replacement of BGA packages on printed • Use caution when profiling to insure minimal tem- circuit boards is fairly straightforward. However, reat- perature difference (<15°C and preferably <10°C) tachment or touch-up of BGA packages that have already ponents been soldered to the board is not practical in most cases. • Forced convection reflow with nitrogen preferred Three important criteria should be considered when (50 – 75 PPM) choosing a rework system: • Preheat stage temperature ramp rate: <2°C per • Minimize the change in temperature across the second solder joint array to promote good solder joint forma- • Time required in Flux Activation stage: 150 to 180 tion, minimize intermetallic growth, improve seconds solderability and ponent warpage • Flux Activation stage temperature range: 150 to • Minimize die temperature to prevent die delamina- 183°C tion and wire bond failure • Time required in Solder stage: 60 seconds • Minimize board temperature adjacent to the rework site to reduce intermetallic growth, prevent second- • Maximum temperature 210 - 220°C (Do not exceed ary reflow, and prevent ponent 10 seconds at maximum temperature) delamination • Cool-Down stage temperature reduction rate: <2°C per second Refer to Ap
BGA Solder Reflow and Rework Recommendations 来自淘豆网www.taodocs.com转载请标明出处.