下载此文档

《直埋光缆施工前准备(路由复测)作业指导书》.doc


文档分类:通信/电子 | 页数:约8页 举报非法文档有奖
1/8
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/8 下载此文档
文档列表 文档介绍
组别;第五组组长;尹寒冬组员;李韵、刘朝、马重茹、王莹莹、王芳芳、刘亚静目录1适用范围······················································32作业准备··············································································································································33主要任务······················································34施工程序与工艺流程············································35施工要求······················································46劳动力组织····················································57复测小组所需机具、材料········································58安全及环保要求··················································································································································××电力××段通信工程直埋光电缆施工前准备(路由复测)。,还应该根据设计图纸、可行性施工组织设计、图纸核对记录、设计交底及现场调查情况,针对本次工程澄清技术问题,熟悉规范和技术标准。并对制定的施工方案、质量、安全保证措施及应急措施对相关人员进行交底。,创办住宿及办公房屋及配置日常生活办公用品,满足主要技术管理人员进场生活办公需要,配备各种施工所需工具及仪器仪表。、敷设方式、环境条件以及中继站站址。、核定中继段间的地面距离;管道路由并测出各人孔间的距离。、公路、河流、水渠以及其他障碍物的技术措施及地段,并核定设计中个具体措施实施的可能性。、防雷、防白蚁,防强电地段的长度、措施及实施可能性。、修改施工图设计。、园林等补偿地段、范围以及对困难地段绕行的可能性。,初步确定街头位置的环境条件。、光缆分屯及敷设提供必要的数据资料。,在起始点、三角定标桩或拐角桩位置插大标旗。大标旗间隔一般为1-2km。,必须掌握基本方法,才能正确地测出地面实际距离,以确保光缆配盘的正确性和敷设工作的顺利进行,测距有两种方法,一种方法就是标杆和激光测距仪配合直接测距,目前大多数采用

《直埋光缆施工前准备(路由复测)作业指导书》 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数8
  • 收藏数0 收藏
  • 顶次数0
  • 上传人文库旗舰店
  • 文件大小70 KB
  • 时间2019-09-15