下载此文档

汽机上部结构施工方案hah.doc


文档分类:建筑/环境 | 页数:约28页 举报非法文档有奖
1/28
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/28 下载此文档
文档列表 文档介绍
······························································································································································································································································································································································································································································(首两台1000MW级机组)扩建工程#7号机组汽机基座为整体框架式现浇钢筋混凝土结构,位于汽机房0/A~4/A,14~19轴之间。整个基础分底板和上部结构两部分。底板已经施工完毕,基座上部结构从标高-,,~,×,×,×,×,×,×,×,共同支撑上部结构顶板。,17轴设中间梁,。~。运转层是上部结构的核心部分,平面结构标高参差不齐,、、。:2600㎡钢筋总用量约为:475t埋件总用量约为:20t混凝土总用量约为::汽轮发电机基座上部结构:2008年9月29日到2008年02月11日。《火电施工质量检验及评定标准》第一篇,土建工程篇《电力建设施工及验收技术规范》SDJ69—87《电力建设安全工作规程》DL5009—2002《电力建设工程施工技术管理规定》《工程建设标准强制性条文》房屋建筑部分《电力建设消防施工质量通病守则》《混凝土结构工程施工质量验收规范》GB50204—2002《钢结构工程施工质量验收规范》GB50205—2001《钢筋焊接及验收规程》JGJ18—96《钢筋机械连接通用技术规程》JGJ107—96《混凝土质量控制标准》GB50164—92《建筑施工扣件式钢管脚手架安全技术规程》JGJ130—2001《汽机基座上部结构图》F0142S1—T0225广东国华台山发电厂二期(2X1000MW)扩建工程——、验收表格齐全建筑工地7施工机械全面检查、检修、认证完,保证使用的可靠性工程部8施工人员熟悉图纸、技术要求,明确施工范围和内容建筑工地9厂区测量控制网(方格网)施测完毕,并通过验收建筑工地10搅拌站机械安装完,并通过计量认证具备混凝土生产能力质量部11所有施工人员全部进行入场教育及安全教育,合格后上岗安监部12本工程前期施工所需材料进场物资部13施工组织机构健全并有序运转质量部14安全技术交底及双签字完成建筑工地15现场交通道路满足施工要求工程部序号技术准备责任单位备注16现场消防、安全设施齐全,、资格序号作业人员工种资格要求人数1行政负责人有整体指挥能力,责任心强,协调能力强12技术负责人有施工经验,熟悉图纸,能现场解决技术问题并了解验收要求,责任心强13施工工长了解现场施工程序及方法,具有一定的协调能力24安监员掌握安规有安监证、责任心强25质检员有质检证,熟悉规范和图纸26技术员有现场施工经验熟悉图纸27力工身体强壮无疾病、残疾308电工有证、本工种操作技能熟练29资料员熟悉资料管理程序210焊工有证、本工种操作

汽机上部结构施工方案hah 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数28
  • 收藏数0 收藏
  • 顶次数0
  • 上传人czhenrgjiangh
  • 文件大小354 KB
  • 时间2020-07-10