下载此文档

2010全国生物材料大会论文集之 (1299).pdf


文档分类:论文 | 页数:约4页 举报非法文档有奖
1/ 4
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/ 4 下载此文档
文档列表 文档介绍
Intermediate Experiment on the Recycling of Coke
Plant Effluent through Washing Water Closed Circuit
System in Coal Preparation Plant
Cai Chang-feng Xu Jian-ping
Biological and Chemical Engineering Biological and Chemical Engineering
Anhui University of Technology and Science Anhui University of Technology and Science
Wuhu, Anhui Wuhu, Anhui
******@auts. ******@auts.

Abstract—Washing coal usually brings about wastewater ways must be explored to dispose phenol-cyanogen
(in terms of closed circulation) due to transpiration, which provides wastewater (hereinafter the short form coking reclaimed
an effective space for the recycle of coke-plant wastewater. The water) from biochemical on the recycling
effluent from phenol-cyanogen wastewater biochemical disposal economy, and the different requirements of the water quality in
station is used plementary water for washing coal, and Closed- the industrial chains of coal carbonization base, the idea of
Cycling System in coal preparation plant is introduced to make greater circulation has been put forward. By using phenol-
industrial experiment. Results show that we can use coal power cyanogen wastewater from the biochemical disposal station as
adsorption and ulation as well as sedimentation to treat the the coal washing water and introducing the washing water
contaminatio

2010全国生物材料大会论文集之 (1299) 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数 4
  • 收藏数 0 收藏
  • 顶次数 0
  • 上传人 一文千金
  • 文件大小 0 KB
  • 时间2011-12-24
最近更新