WATER LEVEL GAUGE IN7010#01 .0 Language UK Page 1/ 2 Water level gauge 1 Mounting on boiler This section describes how to mount the water level gauge on the boiler side. Water level gauge on boiler side Figure 1 Step A: Remove nuts (1) and lift off stuffing box head (2) from cock. Step B: Insert gaskets between cock flanges and boiler flanges and bolt up the cocks S and W on to the boiler flanges. Step C: Place the stuffing box heads (4) on the end tubes (5) - insert joint rings (3) in the recess of each cock. 6W S 4 51 G 1 - Nut 2 - Box heads 3 - Joint rings 4 - Box heads 5 - Tubes 6 - Screws 7 - Screws 8 - Cock plug D - Drain cocks G - Gauge body S - Cocks W - Cocks WATER LEVEL GAUGE IN
欧宝锅炉说明书 来自淘豆网www.taodocs.com转载请标明出处.