下载此文档

欧宝锅炉说明书.doc


文档分类:办公文档 | 页数:约2页 举报非法文档有奖
1/2
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/2 下载此文档
文档列表 文档介绍
WATER LEVEL GAUGE IN7010#01 .0 Language UK Page 1/ 2 Water level gauge 1 Mounting on boiler This section describes how to mount the water level gauge on the boiler side. Water level gauge on boiler side Figure 1 Step A: Remove nuts (1) and lift off stuffing box head (2) from cock. Step B: Insert gaskets between cock flanges and boiler flanges and bolt up the cocks S and W on to the boiler flanges. Step C: Place the stuffing box heads (4) on the end tubes (5) - insert joint rings (3) in the recess of each cock. 6W S 4 51 G 1 - Nut 2 - Box heads 3 - Joint rings 4 - Box heads 5 - Tubes 6 - Screws 7 - Screws 8 - Cock plug D - Drain cocks G - Gauge body S - Cocks W - Cocks WATER LEVEL GAUGE IN

欧宝锅炉说明书 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数2
  • 收藏数0 收藏
  • 顶次数0
  • 上传人yzhlya
  • 文件大小459 KB
  • 时间2017-02-16