Ericsson-ESET light version Rev. A.ppt


文档分类:管理/人力资源 | 页数:约46页 举报非法文档有奖
1/ 46
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/ 46
文档列表 文档介绍
ESET
ENC Supplier Evaluation Tool
(Light Version)
Process
2 self-assessment questionnaires will be collected before the site visit.
The assessment will follow the process of opening meeting, site visit, interview and conclusion.
When the score of a particular parameter is lower than 4, detail findings will be reported and improvement plan must be presented by supplier to ENC within 2 weeks. While the score is lower than 6 the improvement plan is either up to the supplier or required by ENC .
The evaluation is done in two steps:
Assess which of the descriptions “High”, Medium” or “Low” best fit your current situation
Within the given performance level, what is your score taking into account how well you fit the description
The score results should be agreed by both side in the assessment.
ESET Introduction - Process
9
8
7
6
5
4
3
2
1
Management System
Security and Risk Management
Supply Management
Supplier Development and Management
Manufacturing
Quality Control
Design and Product Change
ESET Introduction - Parameters
ESET Introduction - Agenda
Normally the assessment takes 2 assessors 1 day.
Opening meeting 20 minutes
Split to 2 teams for interview
Internal assessment team meeting 60 minutes
Closing meeting 30 minutes
Before the start the follow material need to be prepared by suppliers:
Company presentation
Quality Manual
Management responsibility
Process petence Management
Control of documents
Control of records
Internal quality audits
Corrective and Preventive actions
Measurements
Improvement process and tools
ESET Management System (MS)
ESET MS - Management Responsibilities
High Top management mits to and involve in the development and implementation of the management system and continual improvement to ensure the suitability and effectiveness. Company vision, mission and objectives are consistent with the quality policy and business requirements and are broken down to all levels in anization and reviewed. The actions for off-tracks ar

Ericsson-ESET light version Rev. A 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数 46
  • 收藏数 0 收藏
  • 顶次数 0
  • 上传人 管理资源吧
  • 文件大小 0 KB
  • 时间2011-08-06
最近更新