Total Productive Maintenance.ppt


文档分类:管理/人力资源 | 页数:约33页 举报非法文档有奖
1/33
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/33
文档列表 文档介绍
ponents
Operations
Total Productive Maintenance
Allen Jiang

TPM Objective
Maximum productivity
Subjects
Key ess factors for effective TPM
implementation
Understanding and ing perceived
barriers to TPM
Equipment-The focus of TPM: Eliminating
Equipment downtime, idling and minor
stoppages
Subjects
Measuring true equipment productivity
Managing the change: Motivating people
from the production, maintenance and
engineering area to work on permanent
productivity improvement
Key ess factors
Develop a system of productive maintenance for equipment
Involve all departments that plan, design, use, or maintain equipment in implementing TPM
Key ess factors
Actively involve all employees-from top management to shop-floor workers
Promote TPM through motivation management: autonomous small group activities
Understanding and ing perceived barriers to TPM
Changing how we look at breakdowns
From “ all equipment eventually breaks down ” to “ equipment should never break down ”
From “ I just manage equipment, you just operate it, and he just fixes it ” to “ I am the owner of the equipment, and we should work together ”
Eliminating Equipment Downtime
Six big losses in equipment operation
Eliminating Equipment Downtime
Definitions
Breakdowns due to equipment failure
Setup and adjustment
Features
Breakdown losses: time and quantity
Setup and adjustment losses: reducing internal setup time
Eliminating Equipment Downtime
Five requirements of Zero breakdowns
Maintain basic equipment conditions
Depend on operating conditions
Restore deterioration
Correct design weaknesses
Improve operating and maintenance skills

Total Productive Maintenance 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数33
  • 收藏数0 收藏
  • 顶次数0
  • 上传人管理资源吧
  • 文件大小0 KB
  • 时间2012-02-11