下载此文档

测井英语.doc


文档分类:外语学习 | 页数:约3页 举报非法文档有奖
1/3
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/3 下载此文档
文档列表 文档介绍
测井作业英语100句
check the bridle 。
Change to a long electrode 。
Fill in the bridle with 。
Connect the bridle to the logging 。
Connect the cable head with the 。
Disconnect the 。
Which cable conductor has low dielectric strength?几号电缆绝缘低?
How many ohms does it read?有多少欧姆?
Connect the tools 。
Connect the tools at the well 。
Connect the tools with a 。
Start to make before-logging 。
Put the r calibrating jig on to the 。
Make a calibration for GR tool. 做GR仪器刻度。
Make sure that the position is 。
Take the calibrator a bit 。
Put on the large caliper 。
Put the tool on the high 。
Take down the 。
Fill in the calibration tube with 。
Add some detergent into 。
The connection is no good. tighten the thread a little bit.
接触不好,再把丝扣紧一紧。
Put the surface electrode into the mud 。
Lift up the upper 。
Lift the sheave a bit 。
Make sure that the floor chain is 。
Stretch the cable tight when pulling it to the well head.
放电缆时要拉紧电缆。
Hand me the spanner wrench, 。
There’s something wrong with this tool, change it for another one.
这支仪器有问题,换另一支仪器。
Hold

测井英语 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数3
  • 收藏数0 收藏
  • 顶次数0
  • 上传人sxlw2016
  • 文件大小43 KB
  • 时间2018-07-11