下载此文档

工程管理概论论文.doc


文档分类:论文 | 页数:约5页 举报非法文档有奖
1/5
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/5 下载此文档
文档列表 文档介绍
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measuremen存在不可原谅的浪费和决策失误,因而我们有必要将这个问题进行认真的讨论和研究。
正文:
首先,需要明确的是工程的成本绝不是大多数人所看到的诸如工地施工这个简单的方面。事实上,这个确实是一个工程的重要的组成部分。但如果从一个工程的全寿命周期来看,这样未免显得片面。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of

工程管理概论论文 来自淘豆网www.taodocs.com转载请标明出处.

非法内容举报中心
文档信息
  • 页数5
  • 收藏数0 收藏
  • 顶次数0
  • 上传人沐雪
  • 文件大小28 KB
  • 时间2022-03-24
最近更新