下载此文档

毕博—石油国际全套咨询32426emcproposalfinal.ppt


文档分类:管理/人力资源 | 页数:约73页 举报非法文档有奖
1/73
下载提示
  • 1.该资料是网友上传的,本站提供全文预览,预览什么样,下载就什么样。
  • 2.下载该文档所得收入归上传者、原创者。
  • 3.下载的文档,不会出现我们的网址水印。
1/73 下载此文档
文档列表 文档介绍
Response to Request for Proposal “Infrastructure Scalability Audit”
January 23, 2001
Engineering Server Resources
Submitted to:
Debra Utterback Infrastructure Scalability Audit Project Manager EMC Corporation, Engineering Server Resources 171 South Street Hopkinton, MA 01748-9103
Submitted by:
Robert Ziegler KPMG Consulting, LLC 99 High Street Boston, MA 02110-2310 (617) 988-1137 Fax (617) 988-0810
Business Development Manager: Ray Espinola High Tech Industry–Electronics Segment KPMG Consulting, LLC (617) 988-1468
Confidentiality Statement: Please be aware that no part of this proposal may be reproduced in any form or by any means, electronic or mechanical, including photocopying and recording, for any purpose without the express written consent of KPMG Consulting, LLC. In addition, due to the proprietary nature of KPMG methodologies and other information enclosed herein, this proposal may not be shown to any third party without the prior written consent of KPMG Consulting, LLC.
KPMG Consulting attests to the accuracy pleteness of this Proposal and further, that we plied with the instructions, formats and stipulations of the Infrastructure Scalability Audit RFP regarding Proposal construction, deadlines, preparation and presentation of pricing information.
32426BOS
Table of Contents
Section 1 Executive Summary 1
Section 2 ECOSTRUCTURE Alliance 5
Section 3 Requirements Proposal 8
Section 4 Methodology Overview and Description 9
Section 5 Timeline for Implementation 15
Section 6 Price Proposal 24
Section 7 Proposal of Terms, Conditions and Other Requirements 25
Section 8 Past Experience/Performance 35
Section 9 Staffing Plan 41
List of Figures
Figure 4-1. Four Physical Domains of the e-IA Analytical Framework 10
Figure 4--Infrastructure Assessment Strategy 10
Figure 4-3. e-Infrastructure Assessment Model 11
Figure 4-4. e-Infrastructure Assessment Model – plete Picture 12
Figure 4-5. e-Infrastructure Assessment Report 13
Figure 4-6 Assessment Deliverab

毕博—石油国际全套咨询32426emcproposalfinal 来自淘豆网www.taodocs.com转载请标明出处.

相关文档 更多>>
非法内容举报中心
文档信息
  • 页数73
  • 收藏数0 收藏
  • 顶次数0
  • 上传人iris028
  • 文件大小2.34 MB
  • 时间2018-07-18