Date : 1、CURRENT STATUS: PROJECT: Latte printer LINE: Main frame & sub line Operators (original): Leader : 2 EA Repairer: 1EA Mobile OP: 1EA Direct OP: 20EA(Main line) Direct OP: 17EA(Five Sub) Total Operators: 41 EA Take Time: 45 Sec Target Capability: 80pcs/h Expectation Effect: Planning Action Reduce the headcount the line; operation; transit Reduce Lead time over production; WIP Increase the value of space layout ; over production Improve quality transit ; fixture to fool proofing Line Status: Line Area: =12M*-8* = 2、MAIN LINE & SUB LAYOUT (original) 12M
8M
3. WORK SAMPLING STATISTICS & H/C EVALUATION: Line & Sub Layout (improved) Line Status: Line Area:12M* =54mm 12M
5. PROCESS FLOW CHART Main Frame Barrow,70m,40EA/time(16EA/BOX) Assembly Barrow,5m,36EA/time(12EA/BOX) Left Frame Assembly Right Frame ACM Gear Train Duplex Ass’y Barrow,70m,160EA/time(80EA/BOX) Barrow,10m32EA/time(16EA/BOX) Main Frame Assembly Left Frame Assembly Right Frame ACM Gear Train Duplex Ass’y Change 6. PRODUCTION LINE Eliminate waiting, Neither make anybody too busy, Nor make anybody too free! Only a Fair Environment is able to found high work morale. 7. DIFFERENCE 差异项目 Difference Item 当前实际 Actual 改善后 Improved 比率 Ratio 备注 Remark 人员 Human Leader 2 1
Now we don't need to transit five sub to main line. Repairer 1 1
Mobile OP 1 1
Direct OP 37 28
Total 41 31
设备/夹具 Fixture Fixture 18 11
Rack 2 0
Screw driver 21 20
Screw Supplier 6 6
占用面积 Area 67mm 54mm
Lead Time ( hour )
每小时人均产能 Capability PPH
8-1. DETAIL OF KAIZEN(1) Before Improving After Improving Type of Waste Improving Action Transportation: Ops need transit printer from conveyer belt t