此矿区内有3层煤可采,,,~,煤层平均倾角为14°。,。本设计采用三斜井二水平开拓,划分六个采区,一水平可回采101、201采区,初期采用井筒做上山,单一走向长壁采煤法采煤,综合机械化回采工艺。通风方式为中央并列式通风。采煤方法为走向长壁采煤法,采煤工艺采用综合机械化采煤工艺。
关键词斜井开拓采煤工艺走向长壁采煤法
全套图纸,加153893706
Abstract
This design is the new shaft of the Mt/a to Dayan
This mineral zone inside has 3 lamella coal whole zones can adopt, average thickness in coal seam is meters, strike length is , dipto length ~, average rake angle in coal seam is 14 adopt to keep quantisty as , can adopt time limit as design adopts the well two levels expand, dividing the line eight adopt the zone, a the level can return to adopt the 101, 201the zone, the adoption concentrates the big lane arranges, one alignment lengthways the wall adopts the method of coal adopts the coal, synthesizing the mechanization return to adopt the the way is a central margin type to ventilate. the technology of coal mining adopts prehensive mechanization technology of coal mining.
Keywords: Inclined dhaft development Mining technology Inclined longwall coal mining method
目录
摘要 I
Abstract II
目录 III
绪论 1
第1章井田概况及地质特征 2
2
2
2
、湖泊 3
3
3
3
4
、厚度及特征 5
5
5
第2章井田境界储量服务年限 7
7
7
7
8
8
8
9
9
10
10
11
第3章井田开拓 12
12
12
12
13
13
25
26
26
26
26
27
27
27
29
29
井筒布置和施工 31
31
31
32
34
34
、存车线路
采矿工程毕业设计(论文)-大雁矿业集团二矿0.9Mta新井设计[2] 来自淘豆网www.taodocs.com转载请标明出处.