水利工程建设程序管理暂行规定
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate 书阶段
1.项目建议书应根据国民经济和社会发展长远规划、流域综合规划、区域综合规划、专业规划,按照国家产业政策和国家有关投资建设方针进行编制,是对拟进行建设项目的初步说明。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
咨询机构对可行性报告进行评估,并综合行业归口主管部门、投资机构(公司)、项目法人(或项目法人筹备机构)等方面的意见进行审批。
4.可行性研究报告经批准后,不得随意修改和变更,在主要内容上有重要变动,应经原批准机关复审同意。项目可行性报告批准后,应正式成立项目法人,并按项目法人责任制实行项目管理。
第六条 初步设计阶段
1.初步设计是根据批准的可行性研究报告和必要而准确的设计资料,对设计对象进行通