合同专用条款(范本)
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size规范的名称:相关的全国施工及验收规范、中华人民共和国国家标准的计价规范等。
4、通讯联络
各方通讯地址、收件人及其他送达方式
(1) 各方通讯地址和收件人:
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured10
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
(6)组织现场交验的时间:开工前七天内。
(7)组织图纸会审和设计交底的约定:开工前七天内。
(8)发包人应做的其他工作及约定:协调处理施工场地周围地形关系和邻近建筑物、构筑物(包括文物保护建筑)、古树名木等的保护工作。
(9)委托人给承包人负责的部分工作:无
支付期及支付方式的约定
(1) 工程价款支付期限:按合同支付的有关规定。
(2) 工程价款支付方式:按