PYRAMID CONSTRUCTION ENGINEERING ( PTE ) LTD
QUALITY PROCEDURE
DOC. NO. : PCE-QP-PJT-05
REV. : B
SHEET : 1 OF 5
EFFECTIVE DATE – 18/01/99
TITLE: INSPECTION & TESTING
Rev. #
Description of Change
Clause #
A
B
C
Initial Release
Form No. I&T-QR-01 -
1) delete “check” at top right hand corner
2) include “std” under heading of “Acceptance Criteria”
3) change “C – Certificate Review” to “Certificate Point”
Form No. I&T-QR-02 -
1) Change “Step” to “Item”
2) delete “checked” at top right hand corner
3) under heading of Applicable WI – delete “WI” and include “SOP”
4) change “C – Certificate Review” to “Certificate Point”
.
Document Controller
(Signature) (Designation) (Date)
Reviewed By
Manager, Construction Dept
(Signature) (Designation) (Date)
Approved By
Management Representative
(Signature) (Designation) (Date)
PYRAMID CONSTRUCTION ENGINEERING ( PTE ) LTD
QUALITY PROCEDURE
DOC. NO. : PCE-QP-PJT-05
REV. : B
SHEET : 2 OF 5
TITLE: INSPECTION & TESTING
1. Purpose: To define the procedure for the inspection and testing of materials / works to specified requirements and the necessary controls to achieve and maintain the required standard.
2. Scope: This procedure applies to the Construction Department.
3. Reference: PCE-QP-PJT-06 - Inspection and Test Status
PCE-QP-PJT-07 - Non-conforming Product Control & Review
PCE-QP-QS-03 - Corrective A